| Demolition begins at 192 |
Piles of recycled asphalt and the
preparation for drainage installation at Palm Bay |
 |
 |
| Removing the wall from the old 192 bridge |
192 Median Footing Excavation |
 |
|
| Removal of the end span |
|
 |
 |
| The first piling installed in the footer |
Temporary shoring to support crane |
 |
 |
| 192 Interchange November 08 |
192 Interchange December 08 |
 |
 |
| Drainage installation and pond outfall
north of Palm Bay 11/08 |
Temporary shoring to support crane |
 |
 |
| The median columns are complete at 192 |
The permanent retaining wall begins on the
south side of 192 |
 |
 |
| Forms in place for the new center span 192. |
The northbound old bridge on the right and
the new center span 192 |
 |
 |
| The center span is decked and the first
layer of reinforcing steel is placed |
Completed bridge deck and approach slab
reinforcing |
|
 |
| Aerial showing demolition of old southbound
bridge and traffic on new bridge |
Aerial from Sept 2009 |
 |
 |
| Progress as of 11 27 09 |
Progress as of 12 09 |
 |
 |
| Aerial from 03 2010 |
Completed bridge east side |
 |
 |
| Grading northbound on ramp |
Sod and grading 11/2010 |
 |
 |
| Removal of temporary median
drainage system 5/2011 |
 |
 |
| Aerials from July 2011 |