 |
 |
| From the Pineda Bridge looking east to the
new causeway |
The new southbound off ramp at Pineda |
 |
  |
| The new northbound off ramp at Pineda |
The new southbound on ramp at Pineda |
 |
 |
| Preparing the roadway base |
The Wickham approach looking south |
 |
 |
| Shaping the base to the correct grade and
cross slope |
Placing the first layer of asphalt |
 |
 |
| Paving Operations |
Checking for the correct depth |
 |
 |
| Pineda west approach looking East |
New Pineda Southbound on Ramp |
 |
 |
| Lake Washington looking South |
Lake Washington looking North |
 |
 |
| Paving Ramps |
 |
 |
| First course |
Rain Delay |
 |
 |
| Miscellaneous |
Paving ditch |