| Future location of the Pineda Interchange |
Step 1 pile driving |
 |
 |
| Pile driving on the east pier begins |
Template holding piles in place |
 |
 |
| Median Pier foundation |
Median Columns being poured |
 |
 |
| Retaining wall under construction |
Close up of completed wall |
 |
 |
| A view of the top of the wall with the tops
of the pile exposed. |
Reinforcing steel in center cap |
 |
 |
| July progress with walls and zoo tunnel
underway. |
Beam Setting |
 |
 |
| Beam Setting |
Beams in place and braced |
 |
 |
| Top of the new bridge looking east |
Top of the new bridge looking west |
 |
 |
| Zoo Trail Tunnel |
Zoo Trail Tunnel |
 |
 |
| Zoo Trail Tunnel |
Aerial view before deck pour |
 |
 |
| Delivery trucks dump the
concrete into a pump that pumps it up onto the bridge. |
 |
 |
| Pouring the concrete for the
bridge deck |
 |
|
| The yellow machine in the
background spreads and finishes the wet concrete |
 |
 |
| Progress as of November 09 |
Progress as of December 09 |
 |
 |
| New retaining walls on the
south side of the Zoo Trail Tunnel |
 |
 |
| Connection to the new Pineda
Causeway |
 |
 |
| West approach looking east
(left) looking west (right) |
 |
 |
| From new Pineda Bridge looking
north (left) and south (right) |
 |
 |
| Grading and sodding slopes |
  |
| North side of Conspan and
sidewalk |
  |
| South side of Conspan and
sidewalk |
 |
 |
| Pineda looking West |
Connection to the new Causeway |
 |
 |
| Ramp connections 11/2010 |
 |
 |
| January 2011 |
 |
 |
 |
 |
| Striping and signs completed |
 |
 |
| Pineda ribbon cutting |
| |
|