SR 79 - Progress Photos
Select a Photo for Larger View
August 2009
|
Contractor placing Friction Course |
Contractor placing Friction Course |
Please Check back soon for Photo |
Please Check back soon for Photo |
July 2009
|
CEI Personnel Surveying Pond |
Construction Crew checking Roadway Grade |
Grading Roadway prior to Paving |
Placing Pedestrian Rail on Bridge |
May 2009
|
Placing Structural Course Asphalt - Southbound |
Placing Concrete for Box Culver top |
Southbound Bridge Substructure progress |
Completed Retention Pond |
April 2009
|
Placing Finish Soil Layer in Median |
Placing Concrete in Box Culver Walls |
Placing Concrete Ditch Pavement in Median |
Southbound Bridge Substructure progress |
March 2009
February 2009
|
Removing existing Asphalt Roadway via Milling |
Placing Limerock Base on north end of Project |
Placing Structural Course Asphalt |
Continuing Test Pile driving for Southbound Pine Log Creek Bridge |
January 2009
December 2008
|
Paving NB Travel Lanes (Structural Course) |
Recently Completed Retention Pond |
Placing Sod |
Inspector Checking Guardrail Placement |
November 2008
|
Placing Concrete Approach Slab - NB Bridge |
Placing Concrete Ditch Paving |
Pouring Box Culvert Bottom at Big Crooked Creek |
Pouring Box Culvert Top at Big Crooked Creek |
October 2008
|
Box Culvert Construction at Little Crooked Creek |
Box Culvert Construction at Little Crooked Creek |
Structural Course Asphalt placed on N.B. Lanes |
Pine Log Creek Bridge progress |
September 2008
August 2008
July 2008
|
NB lanes, north of Pine Log Creek Bridge |
New SB lanes |
NB bridge with beams installed |
Placing decking on NB bridge |
June 2008
May 2008
April 2008
March 2008
February 2008
![]() Placing GeoSynthetic Fabric |
Pond 9 progress |
Construction crew begins Placement of Pile Template at Pine Log Creek Bridge |
Primed Limerock ready for Paving, located near station 272+00
|
January 2008
|
Compacting Backfill around Drainage Pipe and Inlet |
Placing Concrete for Box Culvert at Pigeon Creek |
Box Culvert Construction located at Pigeon Creek |
Inside Form-Work inside the same Box Culvert |
December 2007
![]() Shaping Drainage Ditch near sta. 97+00 |
![]() Shaping Drainage Ditch near sta. 125+00 |
![]() Embankment Construction near sta. 175+00, Left Roadway |
![]() Construction Progress at Pigeon Creek |
November 2007
|
Clearing & Grubbing |
Compacting Embankment on Southbound |
Shaping Ditches along Southbound Lanes |
Floating Turbidity Barrier placed in Pine Log Creek |
October 2007
|
Clearing & Grubbing |
Clearing & Grubbing |
Clearing & Grubbing |
CEI Personnel Surveying with GPS |
September 2007
|
SR 79 Prior to Construction |
Existing Pine Log Creek Bridge |
Existing Pine Log Creek Bridge |