SR 79 Ebro - Progress Photos

 

August 2009

 

Clearing & Grubbing

Clearing & Grubbing

 

September 2009

Clearing & Grubbing

Clearing & Grubbing

 

October 2009

Clearing & Grubbing

Clearing & Grubbing

 

November 2009

Excavating Retention Pond 1

Excavating outside Ditches along Northbound Lanes

Shaping Subgrade & Shoulder - Northbound Lanes

 

 

December 2009

Auguring Drill Shaft for Mast Arm - Signalization (SR 20)

Drill Shaft for Mast Arm

 

January 2010

Roadway Excavation - Northbound

Roadway Excavation - Southbound

 

February 2010

Subsoil Excavation - Southbound Roadway

Placing Drainage on East side

 

March 2010

FL DOT & CEI running Density Comparison

Compacting Soil around Drainage inside Trench Box

 

April 2010

Grading and Compacting Stabilized Subgrade

Grading and Compacting Stabilized Subgrade

Placing 48" RCP

 

May 2010

Placing Type E Curb & Gutter

Placing Structural Asphalt

 

Placing Type E Concrete Sidewalk

 

June 2010

Placing Elliptical Cross Drain

Placing Polycarbonate Storm Drain and Structures

Mixing Stabilized Subgrade Material

 

July 2010

Grading Stabilized Subgrade northbound lanes

Shaping and Compacting Limerock Base

Placing Type E Concrete Curb & Gutter

Placing RCP Drainage.