August 2009
|
Clearing & Grubbing |
Clearing & Grubbing |
September 2009
|
Clearing & Grubbing |
Clearing & Grubbing |
October 2009
|
Clearing & Grubbing |
Clearing & Grubbing |
November 2009
![]() Excavating Retention Pond 1 |
![]() Excavating outside Ditches along Northbound Lanes |
|
Shaping Subgrade & Shoulder - Northbound Lanes
|
December 2009
![]() Auguring Drill Shaft for Mast Arm - Signalization (SR 20) |
![]() Drill Shaft for Mast Arm |
January 2010
![]() Roadway Excavation - Northbound |
![]() Roadway Excavation - Southbound |
February 2010
|
Subsoil Excavation - Southbound Roadway |
Placing Drainage on East side |
March 2010
|
FL DOT & CEI running Density Comparison |
Compacting Soil around Drainage inside Trench Box |
April 2010
|
Grading and Compacting Stabilized Subgrade |
Grading and Compacting Stabilized Subgrade |
|
Placing 48" RCP |
May 2010
![]() Placing Type E Curb & Gutter |
![]() Placing Structural Asphalt |
![]()
|
![]() Placing Type E Concrete Sidewalk |
June 2010
![]() Placing Elliptical Cross Drain |
Placing Polycarbonate Storm Drain and Structures |
Mixing Stabilized Subgrade Material |
July 2010
|
Grading Stabilized Subgrade northbound lanes |
![]() Shaping and Compacting Limerock Base |
|
Placing Type E Concrete Curb & Gutter |
![]() Placing RCP Drainage. |