I-95 Project Photo Page 1

utility 1.jpg (166243 bytes)

utility 2.jpg (146734 bytes)

The bridge construction begins with location of utilities

The utilities are verified that they are not in conflict

test pile lift.jpg (70918 bytes)

test pile in temp.jpg (150799 bytes)

The piles are hoisted into position

And set in a supporting frame or template

drive test.jpg (83838 bytes)

test pile splice.jpg (144531 bytes)

The piles are driven into the ground with a diesel hammer The piles are shipped in two pieces and spliced together on the job.
test pile.jpg (106778 bytes) pier 4 footing.jpg (172927 bytes)
The top half ready to be driven After all the pilings are driven they are then cut to length
Brudgebefore.jpg (133854 bytes) SR524 from eb 1 looking north.jpg (134459 bytes)
Before Construction  After bridge foundation construction 
520 steel.jpg (142586 bytes) 524 post pour.jpg (107726 bytes)
Reinforcing steel in place Completed bridge
524 pre pour.jpg (134965 bytes) 524 done.jpg (145686 bytes)
Aerial before Aerial after pour
520 done.jpg (131829 bytes) 520 3 08.jpg (133528 bytes)
  3 9 08
524 looking west.jpg (146400 bytes) 12 08 524 Air.jpg (148280 bytes)
524 on May 08 524 on Dec 08
fiske ponds1.jpg (125456 bytes) fiske ponds.jpg (113387 bytes)
Fiske Ponds Fiske Ponds
n end march 08.jpg (143536 bytes) north transition.jpg (137873 bytes)
North end of project March 08 North Transition May 08
mar 0901.jpg (120863 bytes) mar 0903.jpg (115105 bytes)
March 09, the Fiske Ramps take Shape March 09
mar 0909.jpg (98552 bytes) mar 0907.jpg (113864 bytes)
Concrete Paving has advanced southbound to the Sheriff's Ranch Northbound Fiske On and Off Ramps

Click here to go Back        Click here for a link to: Aerial and other Photography by Volusia Vistas

Click here to go to page 1

Click here to go to page 2    

Click here to go to page 3    

Click here to go to page 4  

Click here to go to page 5